Vesgantti King Size Mattress, 10 inch Innerspring Hybrid Pocket Spring King Bed Mattress in a Box with Memory Foam & Knitted Fabric, Pressure Relief, Medium Firm, Grey

Vesgantti King Size Mattress, 10 inch Innerspring Hybrid Pocket Spring King Bed Mattress in a Box with Memory Foam & Knitted Fabric, Pressure Relief, Medium Firm, Grey

$412.48
Skip to product information
Vesgantti King Size Mattress, 10 inch Innerspring Hybrid Pocket Spring King Bed Mattress in a Box with Memory Foam & Knitted Fabric, Pressure Relief, Medium Firm, Grey

Vesgantti King Size Mattress, 10 inch Innerspring Hybrid Pocket Spring King Bed Mattress in a Box with Memory Foam & Knitted Fabric, Pressure Relief, Medium Firm, Grey

$412.48
Shipping calculated at checkout.

About This

  • 【Medium Firm Plush Feel】King bed mattresses are fully expanded 80*76*10 inch(LWH) approax. Vesgantti luxury mutilayer foam and pocket spring support systerm of mattress provide medium firm yet comfortable feel which will protect and support your lumbar vertebra and back from pain.
  • 【Individual Pocket Spring】Innovative zoned spring support system with ergonomic design of king hybrid mattress is constructed by hundreds of individual pocketed stainless spring coils. Each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture.
  • 【Breathable and Healthy】This mattress is designed with multi-layer foams and pocket spring which increasing good air circulation and breathability. It keeps body comfortable and dry and provides a cooler sleeping environment. This bed mattress contains no fiberglass, which means a healthier sleep environment.
  • 【Ultra Quite】Due to the pocket spring and multilayer foams design, this innerspring mattress can effectively absorb noise and vibration. So you won’t be disturbed by any tossing and turning from your partner and enjoy a peaceful and comfortable sleep.This king size bed mattresses can support weight up to 250 lbs.
  • 【Mattress in a Box】Our mattress king is compressed, rolled, and shipped in a box for ultimate convenient delivery to your door. For a better sleeping experience, please wait 72 hours for the mattress to fully expand. Boxed mattress fits most bedframe types except adjustable frame. You can contact the Vesgantti support team if you have any problems. (Cautions: Make sure no one is standing at the direction where the mattress is rolling out to prevent any unnecessary injury. Once the mattress open and restore, it cannot be rolled back again.)

Overview

  • Brand : Vesgantti
  • Size : King
  • Product Dimensions : 80"L x 76"W x 10"Th
  • Top Style : Euro Top
  • Cover Material : Knitted Fabric
  • Number of Layers : 7
  • Fill Material : Memory Foam
  • Weight Limit : 250 Pounds
  • Special Feature : Pressure Relief
  • Color : Grey
  • Item Weight 91 Pounds : Item Firmness Description Medium Firm
  • : Item Weight 91 Pounds
  • : Item Firmness Description Medium Firm

CARE & MAINTENANCE

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

SHIPPING & RETURNS

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.

You may also like